WB Photo

Will Brownsberger — State Senator, Democrat, 2d Suffolk and Middlesex District

 

 

 

 

 

WB Facebook Page

 

Re substation *1 comment

I think that BMLD should consider using more transformers, rather than two 50 megawatt units.  This would enable us to match the on-line capacity to the actual load more closely.

Consider the savings in the cost of the iron loss in a 50 megawatt transformer not needed to meet demand:

Iron loss at 0.25 % = 125 kilowatts

Cost at 5 cents per kilowatt hour = $6.25 per hour

Annual cost (8760 hours) = $54,760

This will support more than $1 million in 5% bonds or pay off a 20year, 5% loan of $682,000 or a 20 year, 4% loan of $744,000 .The savings would continue after  pay off and Belmont would be “greener”.

--
One Response:

How do you feel about it?

Log in and join the conversation!